SN-CEN/TS 54-14:2018 PDF

SN-CEN/TS 54-14:2018 PDF

Name:
SN-CEN/TS 54-14:2018 PDF

Published Date:
10/31/2018

Status:
Active

Description:

Fire detection and fire alarm systems — Part 14: Guidelines for planning, design, installation, commissioning, use and maintenance

Publisher:
Standards Norway SN-CEN/TS Series

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
ADOPTED_FROM:CEN/TS 54-14:2018 This document provides guidelines for the application of automatic fire detection and fire alarm systems in and around buildings. The guideline covers planning, design, installation, commissioning, use and maintenance of the systems. The guidelines cover systems intended for the protection of life and/or the protection of property. The guidelines cover systems with a control and indicating equipment and at least one manual call point or one fire detector. In the event of a fire the systems may be capable of providing signals to initiate the operation of ancillary equipment (such as fixed fire extinguishing systems) and other precautions and actions (such as machinery shutdown or remote transmission of alarms). These guidelines do not cover the ancillary services themselves or ancillary circuits to interface with them. The guidelines do not cover systems combining fire alarm functions with other non-fire related functions. The guidelines do not recommend whether or not an automatic fire detection and/or fire alarm system should be installed in any given premises. These guidelines should be used by appropriately competent persons. However, guidance is also given to other persons purchasing or using a fire detection and / or fire alarm system. Smoke alarms according to EN 14604 are not fire detection and fire alarm systems.
Number of Pages : 96
Published : 10/31/2018

History

SN-CEN/TS 54-14:2018
Published Date: 10/31/2018
Fire detection and fire alarm systems — Part 14: Guidelines for planning, design, installation, commissioning, use and maintenance
SN-CEN/TS 54-14:2004
Published Date: 07/21/2004
Fire detection and fire alarm systems — Part 14: Guidelines for planning, design, installation, commissioning, use and maintenance

Related products


Best-Selling Products

DRM ASME B31.3 & GUIDE SET
Published Date: 01/01/2000
ASME PROCESS PIPING / PROCESS PIPING: THE COMPLETE GUIDE TO ASME B31.3 SET (ASME B31.3 & ASME B31.3 GUIDE) - YOU SAVE 10% ***INCLUDES B31.3-2020 EDITION***
$160.5
DRM ASME B31.8 PIPING SET
Published Date: 01/01/2000
ASME GAS TRANSMISSION PIPING SET - INCLUDES ASME B31.8, ASME B31.8S, ASME B31.1, ASME B31.3 AND ASME B31.3 GUIDE - YOU SAVE 10%
$364.5
DRM DEEPWATER SET
Published Date: 01/01/2000
DEEPWATER SET INCLUDES THE FOLLOWING STANDARDS: API RP 14J, API RP 2A-WSD, API RP 2FPS, API RP 2RD, API RP 2SK, API RP 2SM, API RP 2T, API SPEC 17J, AWS D3.6M
$274.5
DRM DRM COMBO
Published Date: 01/01/2008
Drawing Requirements Manual (Hardcopy Bound & DVD)
$157.5
DRM DRM DVD
Published Date: 01/01/2008
Drawing Requirements Manual DVD
$104.7
DRM DRM
Published Date: 01/01/2008
DRAWING REQUIREMENTS MANUAL
$104.7